CASE STUDIES - FULL BORE DIRECTIONAL

Go to content

Main menu:

CASE STUDIES

 Patch Point Enterprises Ltd. / Shell Canada
 
  • 1040 meters of 6″ steel
  • 70 meters deep
  • wireline
  • mudmotor
  • 220 meters of elevation change completed with JT100 Ditch Witch
  • Stewart Lake, British Columbia
 Renewable Construction Services
 
  • Wind farm project in Tumbler Ridge, BC
  • Multiple 8″ crossings
  • Air hammer and Trihawk
 Daylight Energy
 
  • Multiple 2″ and 8″ double insulated (12″) crossings
  • Soil, Trihawk up to 500 meters
  • Completed on this project parallel creek crossing wireline
  • Mudmotor 420 meters
  • Grande Prairie, Alberta
 Macro Industries
 
  • Dual 16″ HDPE
  • Soil Conditions
  • Williston Pipeline Project in Hudson Hope, BC
 Glen Armstrong Construction Ltd.
 
  • 26 kilometers of 12″ HDPE
  • Soil and Trihawk
  • September 2011 start, with completion in early January 2012
  • Northern Sunrise – St. Isidore, Alberta
 
Back to content | Back to main menu